Revision 1.9 - 24 -
Electrical Installation
6
When performing electrical installation, be certain to install and secure everything in a way where it is not
subject to damage from moving parts, sharp edges, exhaust systems, etc.
• Any deviation from PALFINGER Liftgates’s recommended power setup (see 6 Electrical
Installation) will void warranty and product liability unless you have a written confirmation by
PALFINGER Liftgates that allows you to do specific changes.
• Never exceed rating of existing fuses located at the battery, control board and/or the pump and
motor which may result in serious damage to the equipment.
• Never jump the 150 Amp circuit breaker at the batteries unless otherwise instructed by the
PALFINGER Liftgates technical support center
• Assure all connections are tight and securely fastened
• Heat shrink any connection to all cables.
• Never secure a cable in a way where it can make contact with other wiring, brake-, fuel- or air-
lines etc. or get pinched against other objects.
6.1
Breaker Installation
• Mount circuit breaker securely in battery box or at positive battery post using supplied buss bar
• Connect liftgate 2Ga. cable to open stud on circuit breaker
• Connect 2Ga. jumper from open stud on breaker to positive battery post if circuit breaker was not
mounted straight at battery
150 AMP
Resetable Breaker
R
E
S
E
T
Figure 19 Circuit breaker installation
Connect 2 Ga cable
Connect here
to Positive
Battery post