
Revision 1.9 - 27 -
6.4
Trail charger installation
Ground Cable
Ground
+-
Liftgate Mount Frame
2 Ga. Liftgate Power Cable
Ground
+-
Aux. Batteries
+-
Ground
+
-
+
Figure 23 Trail charger wiring
• Install the 2 Ga. positive and negative battery cables securely from mount frame to battery and
truck/trailer chassis with proper service loop for sliding liftgate. Make sure the cables cannot catch on
anything during the slide, test several times.
• Running the cables along the frame, secure the cables every 12 inches.
Trail Charger
– aux pin
for tractor ignition
switch
– white
for tractor power
Kommentare zu diesen Handbüchern